Hayman Park was once a space of thriving repo (wetlands).

The project sits at the centre of the Transform Manukau Programme and is a key deliverable of Te Whakaoranga o Te Puhinui: Te Rautaki (Te Puhinui Regeneration Strategy) led by Eke Panuku.

Cover Page Sketch (1)

Hayman Park was once a space of thriving repo (wetlands) providing key function of cleansing water run off before heading into Waipuhinui (Puhinui stream) and then the Manukau Harbour. These repo held valuable biodiversity of native fish, birds, insects, and plants.

Together with Waiohua iwi, Auckland Council Healthy Waters and Ōtara Papatoetoe Local Board, Eke Panuku are working to regenerate this area to improve and retain it as the green lungs of Manukau, supporting sustainable growth.

 

Background

Hayman Park (and Manukau) sits within a significant cultural landscape to mana whenua specifically Waiohua Iwi (comprised of Te Ākitai o Waiohua, Ngaati Te Ata Waiohua and Ngaati Tamaoho). It is important to acknowledge the significance of this site and how this project could contribute to regenerating the whenua (place) and tangata (people).

Hayman Park is a key open space in central Manukau that has been integral to the development of Manukau City Centre. The project sits at the centre of the Transform Manukau Programme and is a key deliverable of Te Whakaoranga o Te Puhinui: Te Rautaki (Te Puhinui Regeneration Strategy) led by Eke Panuku.

Initiated in 2020, the first stage included a new destination playground. Moving forward, this project will upgrade the existing ponds with a naturalised repo, plant extensive native species, create new accessible pathways, develop key entry points, and showcase artwork to support a more culturally and ecologically rich environment.

 

These changes will not only provide habitat for our native flora and fauna but will naturally treat stormwater before it discharges to the Puhinui Stream and Manukau Harbour.

 

Why does this work need to be done?

Hayman Park stormwater ponds were originally built in 1975 as part of the former Manukau City Council’s development of the Manukau City Centre. The ponds provided water quality treatment and quantity control for the surrounding Business Zone, Open Space Zone and road network.

Over time, issues with sediment build-up, bank stability and litter have begun to cause problems with the ponds. Following a review of the options, it was determined that creating a wetland and adding a device to capture litter, would provide the best outcome.

Key milestones

Concept plan – completed

June 2022

Other projects in Manukau

Hayman Playground Kids 072023 0293
  • Manukau
  • Complete

Hayman Park playground

15/03/2022

Find out more
20211019 Wiri Bridge Render Final
  • Manukau
  • Complete

Wiri bridge

01/08/2022 - 18/08/2023

Find out more
PAN0023 627X627
  • Manukau
  • In Progress

Invest in Manukau

13/02/2023

Find out more
Neighbourhoods Manukau02g2 15 Barrowcliffe Bridge
  • Manukau
  • Undergoing Construction

A better walking and cycling route on Barrowcliffe Place

01/01/2018

Find out more
Neighbourhoods Manukau02g2 12 Putney Way
  • Manukau
  • Complete

Putney Way upgrade

01/01/2018

Find out more
New Wiri Playground 1
  • Manukau
  • Complete

Wiri Playground

01/01/2021 - 14/08/2021

Find out more
Neighbourhoods Manukau02g2 08 Panuku Manukau CM Event 0189
  • Manukau
  • Undergoing Construction

Developing the Wiri healthy neighbourhood

01/01/2022

Find out more
13 13
  • Manukau
  • Undergoing Construction

Te Whakaoranga o te Puhinui

15/03/2017

Find out more
Puhinui Ratavine
  • Manukau
  • Undergoing Construction

Te Aka Raataa - Raataa Vine Stream Reserve

05/07/2023

Find out more
Barrowcliffe 0680
  • Manukau
  • Complete
  • Urban regeneration
  • Development
  • Sustainability

Barrowcliffe Bridge

01/12/2020

Find out more
Te Whare Taiao (1)
  • Manukau
  • Complete

Community whare

05/10/2022